
The Lagos State Government has announced a traffic diversion on Osborne Road in Ikoyi from August 15 to 17 to facilitate drainage connection works.The road diversion is designed to minimize disruption according to the Lagos state government while linking newly constructed drains along Modupe Alakija Crescent to the existing underground drainage beneath Osborne Roads median.The Commissioner for Transportation, Mr. Oluwaseun Osiyemi in a statement, said the project involves constructing a cross culvert that requires cutting through a section of Osborne Road before Foreshore Towers.Work will commence at 10 p.m. on Friday, August 15, and is expected to conclude by midnight on Sunday, August 17. The Lagos State Government has released a plan to divert traffic around Osborne Road in Ikoyi, Eti-Osa Local Government for two days, specifically Friday, Aug. 15, to Sunday, Aug. 17 . The Commissioner for Transportation, Mr Oluwaseun Osiyemi saidin a statement.It further quoted Osiyemi as saying, In line with efforts to improve the drainage system on Modupe Alakija Crescent and its environs, there is a need to connect the newly constructed drains, via a cross culvert, to the underground channel beneath the median along Osborne Road.The construction of this cross culvert will require cutting a section of Osborne Road (before Foreshore Towers).The work is scheduled to commence by 10.00 p.m. on Friday, Aug. 15 and end by midnight on Sunday, Aug. 17.The government emphasised that the project is part of efforts to improve drainage infrastructure in the area, which will help reduce flooding and enhance the overall environment for residents and motorists.To ease traffic flow during the construction, the commissioner noted that a counterflow arrangement will be implemented along Osborne/Alfred Rewane Road, covering approximately 100 meters from Modupe Alakija Crescent to the Alfred Rewane Road junction.The Lagos State Traffic Management Authority (LASTMA) will oversee traffic management during the period to reduce inconvenience. The road is expected to reopen fully on Monday, August 18. The post
Lagos announces traffic diversion on Osborne Road from August 15 to 17 for drainage works appeared first on
Linda Ikeji Blog.